United States, Wisconsin, Jefferson City

Combating Moisture Settlement in Wisconsin

Wisconsin Highway 106 (STH-106) was reconstructed over a marsh area approximately 3 years prior, and almost immediately began experiencing differential settlement issues.

Confinement · Drainage · Filtration · H2Ri · Mirafi® · Moisture Management · Reinforcement · Road and Railway Stabilization · Separation · Transportation Infrastructure · Woven Geotextiles
United States, Kentucky, Lexington

Mitigating Expansive Clay Soils in Kentucky

Construction of a new Holiday Inn Express Hotel in Lexington, KY required engineered fill within the proposed parking lot area to achieve plan subgrade elevation.

Building Site Infrastructure · Confinement · Drainage · Filtration · H2Ri · Mirafi® · Moisture Management · Reinforcement · Road and Railway Stabilization · Separation · Woven Geotextiles
United States, Nevada, Elko

Saturated Soils in Elko, Nevada Mine

A mine site in Elko, NV was experiencing trouble with the tunnels spread throughout the project site. The tunnel floors were susceptible to trapping moisture, creating problems for the mine workers and maintenance crews.

Confinement · Drainage · Filtration · H2Ri · Mirafi® · Moisture Management · Reinforcement · Road and Railway Stabilization · Separation · Transportation Infrastructure · Woven Geotextiles
United States, UT, Wellington

Restricting Differential Settlement in Railways, Wellington, UT

The Price River Terminal in Wellington, UT is the Uinta Oil Basin’s newest crude by rail transloading facility. During a portion of the rail extension project, soft clay and silt subgrade was encountered.

Confinement · Drainage · Drainage and Filtration · Filtration · H2Ri · Mirafi® · Moisture Management · Reinforcement · Road and Railway Stabilization · Separation · Transportation Infrastructure · Woven Geotextiles
United States, Illinois, Rockford

Base Stabilization, Rockford, IL

The parking lot at a medical facility in Rockford, IL was being updated and expanded. The pavement on the parking lot was cracking and had shown signs of failure for several years.

Confinement · Filtration · Mirafi® · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Idaho, St. Maries

Subgrade Reinforcement, St. Maries, ID

Potlatch Corporation had to deal with large quantities of unsuitable, saturated soils, generally a result from the constant watering and storage of logs.

Confinement · Filtration · Mirafi® · Nonwoven Geotextiles · N-Series · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, California, San Diego

Subgrade Stabilization, San Diego, CA

At the Naval Base in Point Loma California, soft pumping subgrade was discovered by the contractor when excavating for the dike wall footings.

Confinement · Filtration · Mirafi® · Miragrid® · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Colorado, Palisade

Subgrade Improvement & Base Reinforcement, Palisade, CO

The town of Palisade, located in Mesa County, needed to rebuild its Main Street to keep up with the growing diversity and increased traffic loading, in an expedient and cost-effective manner.

Confinement · Drainage · Filtration · Mirafi® · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
Canada, Ontario, Mississauga

Subgrade Stabilization, Mississauga, ON

In the IMAX parking lot, poor foundation soils required a geosynthetic reinforcement solution to enable the engineers to design and construct the new permeable paver system.

Confinement · Drainage · Filtration · Mirafi® · Reinforcement · Road and Railway Stabilization · RSi-Series · Separation · Transportation Infrastructure · Woven Geotextiles
United States, Washington, Kelso

Subgrade Stabilization, Kelso, Washington

The rainy season of the Pacific Northwest deteriorated the subgrade, causing construction delays.

Confinement · Filtration · Mirafi® · Reinforcement · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Colorado

Base Reinforcement, I-76 and 96th Avenue, CO

Castle Rock Construction Co. (CRCC) is the contractor for this $4 million safety improvement project at the interchange of I-76 and 96th Avenue.

Confinement · Filtration · Mirafi® · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Utah, Eagle Mountain

Base Reinforcement. Eagle Mountain, UT

In Eagle Mountain City, UT, new schools were planned to be built adjacent to a new roadway.The engineer on the project wanted to stabilize the fine-grained subgrade soils which showed some potential to collapse.

Building Site Infrastructure · Confinement · Filtration · Mirafi® · Reinforcement · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Woven Geotextiles
United States, California, Chino

Subgrade Stabilization, Chino, CA

This project site was to be developed with four new commercial/industrial buildings.The buildings were surrounded by asphaltic concrete and Portland cement concrete pavements.

Building Site Infrastructure · Confinement · Filtration · Mirafi® · Reinforcement · Road and Railway Stabilization · RSi-Series · Separation · Woven Geotextiles
United States, North Carolina, Greensboro

Subgrade Stabilization, Bluford Street and Obermeyer Road, NC

NC A&T University needed to replace two sections of roads running through the campus. The existing subgrade material was a poor silty/sandy soil.

Confinement · Filtration · Mirafi® · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Iowa, Ankeny

Subgrade Stabilization, Ankeny, IA

Ankeny Community School District is building a new school, which is being constructed over an existing soft subgrade.

Building Site Infrastructure · Confinement · Filtration · Mirafi® · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Woven Geotextiles
United States, Illinois

Drainage and Separation, Northern, IL

An office parking lot in Northern Illinois was experiencing soft soils that created drainage issues.

Drainage · Drainage and Filtration · HP-Series · Mirafi® · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Massachusetts, Nahant

Armored Revetment Reconstruction, Nahant, MA

TenCate Geosynthetics worked with The Commonwealth of Massachusetts on the reconstruction of a deteriorated armored revetment system, which protects the 1.5 causeway and beachfront parking.

Drainage and Filtration · Environmental Infrastructure · Erosion Control · Erosion Control · Filtration · FW-Series · Mirafi® · Separation · Water Infrastructure · Woven Geotextiles
United States, North Dakota, Lamoure

Dam Overtopping/Spillway, Lamoure, ND

Several recent over-topping events eroded the grass causing significant damage to the existing spillway.

Engineered Structures · Environmental Infrastructure · Erosion Control · Filtration · FW-Series · Geogrids · Mirafi® · Miramesh® · Miramesh® · Separation · Soil Reinforcement · Woven Geotextiles
United States, New Hampshire, Weare

Base Reinforcement & Wicking, Weare, NH

Flanders Memorial Road meandered through various grade changes with steep inclines and declines which had caused extreme wear and tear, and signs of fatigue.

Confinement · Filtration · H2Ri · Mirafi® · Moisture Management · Nonwoven Geotextiles · N-Series · Reinforcement · Road and Railway Stabilization · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Missouri, St. Louis

Subgrade Stabilization, St. Louis County, MO

A new bridge was being constructed over the Missouri River where saturated soil conditions required the need to remove water from under the pavement section at the bridge approaches.

Confinement · Filtration · H2Ri · Mirafi® · Moisture Management · Reinforcement · Road and Railway Stabilization · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States, Wisconsin, Jefferson

Subgrade Stabilization, Jefferson County, WI

Jefferson County Highway Department desired a solution for reconstruction that would minimize the over excavation volume of the wet, organic soils and still provide a firm construction platform for the flexible pavement roadway.

Confinement · Filtration · H2Ri · Mirafi® · Moisture Management · Reinforcement · Road and Railway Stabilization · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
Canada, Alberta, Edmonton

Railway Reinforcement- Edmonton, AB

Canadian Pacific's continuous rail maintenance and safety program identified a section of track on a site northeast of Edmonton, Alberta that was subject to track settlement resulting in cross level variations

Confinement · Filtration · H2Ri · Mirafi® · Moisture Management · Road and Railway Stabilization · RSi-Series · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles
United States

Pond Capping, Midwest, U.S.A

A large United States electric utility initiated the closure of a CCR surface impoundment in 2015.

Confinement · CR-Series · Environmental Infrastructure · Filtration · Mirafi® · Pavement Solutions · Reinforcement · Road and Railway Stabilization · Separation
United States, Alaska, Coldfoot

Capillary Break/Wicking, Coldfoot, AK

The Alaska Department of Transportation (AKDOT) continually faces frost heave problems in their roadways. This road performs a critical link in supporting the needs of moving oil from the North Slope to the lower 48 states.

Confinement · Filtration · H2Ri · Mirafi® · Moisture Management · Reinforcement · Road and Railway Stabilization · Separation · Soil Reinforcement · Transportation Infrastructure · Woven Geotextiles